Starting a Run and/or Sequence

If more than one run is contained in the run sequence, the scheduled run (run with the arrow pointing to it) will be executed. To schedule a run, prior to starting the experiment, move the pointer (cursor) along the left of the run numbers, you should see the pointer change to an arrow. When it becomes an arrow, you can then click the mouse to position the arrow next to the selected run number. This run becomes the scheduled run, which is the experiment that will be run when Start is selected.

Once the sample has been loaded, the experimental parameters set up, and the run scheduled you can start your experiment one of four ways:

For starting conditions pertaining to particular cooling accessories, see these topics: About the RCS or About the LNCS.

  Related Topics